SourcingAI

Ironing and folding machine

I have found results from10000+products and4000+suppliers aboutIroning and folding machine

Commonly Used:
US$
—
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Sheet Laundry Folding Machine
Type: Roller
Type: Slot
Towel Laundry Folding Machine
Type: Vertical
Folding Times: Five
Max Folding Width: 3300mm
Condition: New
Certification: CE
Automatic Grade: Automatic
Application Place: Factory
Middle Thickness Material
Thread Number: Double Threads
Needle Number: Single Needle
Head Number: Single
Customized: Customized
Material: Metal
Application: School
Draining Way: Exhaust
Fuel Type: Electric
Operation Mode: Full-Automatic Control
Capacity: 50-100kg
Automation: Automatic
Feature: High Pressure
Channel's Quantity: Multiple
Heating Type: Steam Heating
No of Rolls: 2
Motor Power: 3kw
Ironing Speed: 0-25m/min
Towel Laundry Folding Machine Type: Full-band
Washing Capacity: 100kg
Roller Fixing Type: Fixed
Brand: Tong Yang
Max Ironing Width: 2800mm
Folding Size of Towel Laundry Folding Machine: ≤500mm×900mm
Folding Times: Multiple
Max Folding Width: 2800mm
Certification: ISO9001
Certification: ISO9001: 2000
Customized: Non-Customized
Application: Hospital
Application: Lab
Channel's Quantity: Single
No of Rolls: 1
Motor Power: 2.2kw
Ironing Speed: 0-18m/min
Brand: Xunduo
Max Ironing Width: 2500mm

Sourcing guidance for Ironing And Folding Machine

What are the key technical specifications to consider when selecting an industrial ironing and folding machine?

When sourcing these machines, prioritize heating efficiency and folding precision. Look for a steam or gas heating system with a high thermal conductivity roller (usually stainless steel or chrome-plated) to ensure uniform heat distribution. The folding section must feature PLC control systems and high-precision infrared sensors to detect fabric edges, ensuring a folding accuracy within ±5mm. Additionally, verify the maximum ironing width (typically 3000mm to 3300mm for hotel linens) and the adjustable speed range (usually 5-30m/min) to match your production line's throughput.

Which international compliance standards and certifications are mandatory for this equipment?

As high-powered industrial equipment, the machine must carry the CE Marking for the European market or UL/ETL certification for North America. Ensure the manufacturer complies with ISO 9001 for quality management. Specifically for the pressure components, look for ASME (American Society of Mechanical Engineers) or PED (Pressure Equipment Directive) compliance to guarantee the safety of the steam cylinders. Noise levels should be kept below 75dB to meet occupational health and safety standards.

How can I evaluate the economic feasibility and ROI of an automated ironing and folding line?

Calculate the Total Cost of Ownership (TCO) by factoring in the initial purchase price, energy consumption (kW/h or kg/h of steam), and labor savings. An automated line can typically replace 3-5 manual workers, leading to a payback period of 12 to 24 months. Request data on energy-saving features, such as frequency inverter drives and heat recovery systems, which can reduce operational costs by up to 20%. Also, consider the availability of wear parts like ironing belts and wax cloths in your local market.

What are the typical usage scenarios and integration requirements for these machines?

These machines are primarily used in hospitality laundries, healthcare textile services, and commercial garment factories. For seamless operation, ensure the machine supports modular integration with existing washers and dryers. Check if the supplier provides API or Ethernet connectivity for remote monitoring and IoT-based maintenance alerts. The floor load-bearing capacity must be verified, as these units can weigh between 2,000kg and 5,000kg.

Cross-Border Procurement Strategy for Heavy Machinery

What are the primary risks when importing heavy laundry machinery from overseas?

The biggest risks involve shipping damage and technical incompatibility. To mitigate these, insist on seaworthy vacuum packaging and reinforced steel frames within the container. Always verify the voltage and frequency (e.g., 380V/50Hz vs 480V/60Hz) before production starts. Use Made-in-China.com's inspection services to conduct a pre-shipment video test run to ensure the machine functions according to the agreed specifications.

How should I negotiate after-sales support and spare parts with a foreign supplier?

Negotiate a comprehensive spare parts kit (including belts, sensors, and fuses) to be included in the initial shipment to cover the first 2 years of operation. Demand a guaranteed response time for technical support (ideally <24 hours) via video conferencing. Ensure the contract specifies that critical software updates are provided free of charge and clarify who bears the cost of international courier fees for warranty parts.

What are the best practices for secure payment and shipping logistics for high-value B2B orders?

For high-value machinery, use Letter of Credit (L/C) or Telegraphic Transfer (T/T) with a staged payment schedule (e.g., 30% deposit, 60% after successful FAT/inspection, 10% after installation). Regarding logistics, CIF (Cost, Insurance, and Freight) is often preferred for buyers to ensure the seller handles the complex loading of heavy units, but ensure the insurance policy covers 110% of the cargo value.

Related queries