SourcingAI

Foam mould

I have found results from200000+products and70000+suppliers aboutFoam mould

Commonly Used:
US$
—
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Special Casting
Clay Dry Sand
Polyurethane Foam Machine
EPS Foam Machine
Automatic Grade: Automatic
Screw Design: Double-Screw
Certification: CE
Condition: New
Customized: Customized
Molding Method: Extrusion
Shaping Mode: Injection Mould
Application: Car
Design Software: UG
Installation: Fixed
Mould Cavity: Multi Cavity
Plastic Material: ABS
Process Combination Type: Single-Process Mode
Runner: Hot Runner
Standard: MISUMI
Material: Aluminium
High Temperature Resistance
Mold Material: Metal Mold
Warranty: 12 Months
Metal Color: Non-Ferrous Metal
Surface Finish Process: Heat Treatment
Thermal Gravity Casting
Resin Sand Core
Machining: M/C Machining
Surface Treatment: Polishing
Surface Roughness: Ra12.5
High-Pressure Air Type
Automation: Automatic
Computerized: Computerized
Molding Material: Metal Mould
Extrusion: Extrusion
Extrusion Mould: Hollow Mould
Nose Application: Profile Molding
Group Control Multi-mode
Pressure of Nose: High Pressure
Non Metal Mould: Inorganic Mould
Metal Mould: Forging Die
Demoulding: Automatic
Using Hardness: >HRC45
Average Wall Thickness: ≤3mm
Mould Life: <500,000 shots
Die Casting Mould
Cavity: Multi-cavity
Working Temperature: (-40℃-300℃)
Usage: Panel Line
Section: Straight
Grade: High Grade
Automatic Grade: Semiautomatic
Certification: ISO
Certification: TS16949
Certification: FDA
Certification: RoHS
Certification: ISO 9001:2000
Certification: ISO 9001:2008
Certification: ISO9001:2008
Certification: QS
Certification: GMP
Certification: REACH
Certification: FCC
Certification: RoHs
Certification: ISO9001
Shaping Mode: Extrusion Mould
High Foaming Polystyrene Mould
Application: Household Appliances
Application: Furniture
Application: Commodity
Application: Electronic
Application: Home Use
Application: Hardware
Application: Machinery Parts
Design Software: AutoCAD
Design Software: Pro-E
Installation: Mobile
Installation: Semi Fixed
Mould Cavity: Single Cavity
Plastic Material: PET
Process Combination Type: Compound Die
Standard: HASCO
Standard: GB
Standard: DME
Material: Iron
Material: Steel
Material: PS
Function: Abrasion Resistance
Function: Moisture-proof
Function: Insulation
Function: Soundproof
Function: Heat Insulation
Function: Light
Function: Corrosion Resistance
Warranty: 24 Months
Warranty: 6 Months
Surface Finish Process: Polishing
Surface Treatment: Heat Treatment
Surface Treatment: Polish
Mould Life: 500000-1000000 times
Usage: Edge Line

Sourcing guidance for Foam Mould

How to choose the right material for a Foam Mould?

Selecting the correct material is critical for durability and production volume. For high-volume production, Aluminum (7075 or 6061 grade) is the industry standard due to its excellent thermal conductivity and lightweight nature. For low-volume prototyping, epoxy resins or CNC-machined plastics may be used. If you are producing EPS (Expanded Polystyrene) or EPP (Expanded Polypropylene), ensure the mould material can withstand high steam pressure and frequent thermal cycling without warping.

What technical specifications are essential for Foam Mould performance?

Buyers must prioritize surface finish and venting systems. A Teflon coating is often required to ensure easy demoulding and prevent foam tearing. Furthermore, the venting hole distribution must be precise to allow air to escape, ensuring uniform foam density and preventing 'voids' in the final product. Always request a wall thickness analysis to ensure the mould can handle the expansion forces of the chemical reaction.

What compliance and quality standards should Foam Moulds meet?

Suppliers should adhere to ISO 9001:2015 for quality management. For moulds used in the automotive or medical sectors, verify compliance with IATF 16949 or specific biocompatibility standards. Ensure the mould design follows safety factors for pressure vessels if it is an injection-foam process, and confirm that all cooling channels are pressure-tested to prevent leaks that could contaminate the foam chemistry.

How can I evaluate the economic feasibility of a custom Foam Mould?

Calculate the Total Cost of Ownership (TCO) by factoring in the mould life cycle (number of shots). A cheaper steel mould might suffer from corrosion or slower cycle times compared to a precision-engineered aluminum mould. Look for suppliers on Made-in-China.com who offer DFM (Design for Manufacturing) reports; this helps identify potential cost savings in the design phase before the first cut is made.

Cross-Border Procurement Considerations for Foam Moulds

What are the primary risks in international Foam Mould procurement?

The biggest risk is intellectual property (IP) leakage and technical misalignment. To mitigate this, ensure you sign a Non-Disclosure Agreement (NDA) and provide detailed 2D and 3D CAD drawings (STEP or IGES format). Another risk is shipping damage; because moulds are heavy and precision-aligned, they must be treated with anti-rust oil and packed in fumigated wooden crates with internal bracing.

How should I negotiate with Foam Mould suppliers?

Focus on the milestone payment structure. A standard industry practice is 40% deposit, 30% after T1 samples approval, and 30% before shipment. Negotiate for a guaranteed number of cycles (e.g., 100,000 shots) and ensure the contract includes a warranty period covering mould repair or component replacement if defects are found upon arrival.

What are the best practices for shipping heavy industrial moulds to a specific country?

Due to the weight, Sea Freight (LCL or FCL) is the most economical method. Ensure the supplier provides a Packing List, Commercial Invoice, and Bill of Lading. For customs clearance, use the correct HS Code (typically 848071 for injection moulds) to avoid tariff penalties. If you are sourcing via Made-in-China.com, consider using their Secured Trading services to ensure payment is only released once shipping documents are verified.

How can I verify the quality of the mould before it leaves the factory?

Always request a Video Trial (T1/T2) and Sample Inspection Report. If possible, hire a third-party inspection agency to perform a 'dry run' of the mould to check for mechanical alignment, cooling leak tests, and ejector pin functionality. Never authorize final payment until you have reviewed the physical samples produced by the mould.

Related queries