Electric crane
I have found results from200000+products and60000+suppliers aboutElectric crane
CE/ISO Certified Customized Mobile Overhead Crane 30m Lifting with Electric Hoist
Ld Electric Single Girder Overhead Crane for Railway Workshops
CE/ISO 1/2/5/10/15t/Ton Low Headroom European Electric Single Girder Overhead Crane for Workshop/Warehouse
CE/SGS/ISO/TUV/EAC Lifting Equipment 2t-20t Beam Mounted Electric Hoist Gantry Crane Machinery Manufacture
Customized 2ton -50ton Electric Overhead Crane with Electric Chain Hoist Cable Hoist
W 031 Gantry Crane with Electric Winch for Hydropower Station
1-12tons Oil-Electric Dual-Purpose Crawler Spider Crane Hydraulic Telescopic Boom Mobile Spider Crane
3 5 10 Ton Single Double Girder Eot Electric Wire Rope Hoist Overhead Crane with Remote Control
5 Ton Single Girder Overhead Bridge Crane with Electric Hoist for Workshop Material Handling
CE ISO Certified Single Girder Gantry Crane with Electric Hoist for Workshop Material Handling
Portable Hydraulic Pickup Crane with Electric Winch Telescopic Boom Small Pickup Truck Crane Mini Jib Crane
Lifting Gtg Stg 100-1200ton Hydraulic Gantry Crane with Electric Lifting Point
500kg 1 Ton 2 Ton Portable Mobile Floor Mounted Standing Boom Electric Jib Crane Grajo De Foque Lifting Equipment
1 Ton 3 Ton 5 Ton Portable Adjustable Mobile Gantry Crane with Electric Hoist Small Frame Gantry Crane
80 Tons with Electric Hoist Over Head Traveling Bridge Cranes Double Girder Crane
Sourcing guidance for Electric Crane
What are the key technical specifications to consider when selecting an electric crane?
When sourcing an electric crane, you must prioritize Lifting Capacity (SWL), Span Length, and Lifting Height. Ensure the motor has a high Duty Class (e.g., ISO M5 or M6) for intensive industrial use. Additionally, verify the Lifting Speed and Cross-Travel Speed to ensure they align with your facility's operational efficiency requirements. For safety, look for Overload Protection Devices and Limit Switches as standard features.
Which international compliance standards are mandatory for electric cranes?
Compliance is non-negotiable for heavy machinery. For the European market, ensure the product carries the CE Marking and adheres to the Machinery Directive 2006/42/EC. For North America, look for ASME B30 standards and UL/CSA certification for electrical components. Globally, ISO 4301 classification for cranes is a critical benchmark for quality and structural integrity.
How do I evaluate the structural durability and safety of a crane from a supplier?
Request Non-Destructive Testing (NDT) reports, such as ultrasonic or X-ray testing on critical weld joints. The steel grade should be at least Q235B or Q345B for structural stability. Ensure the supplier provides Material Test Certificates (MTC) and check if the control system uses reputable brands like Schneider or Siemens to prevent electrical failures during operation.
What usage scenarios require specialized electric crane configurations?
If the crane is used in a Foundry or Steel Mill, it must have Heat-Resistant Shielding and high-temperature cables. For Outdoor Port or Construction use, a Wind-Protection System and IP55/IP65 rated enclosures for motors are essential. In Explosive Environments (chemical plants), you must specify Explosion-Proof (Ex-rated) motors and non-sparking components.
Cross-Border Procurement & Risk Management for Electric Cranes
What are the primary risks when importing heavy machinery like electric cranes?
The biggest risks include Shipping Damage and Technical Mismatch. Due to the size, cranes are often shipped in parts; ensure the supplier uses Anti-Corrosion Packaging (VCI) for sea freight. To mitigate technical risks, conduct a Pre-Shipment Inspection (PSI) via a third party like SGS to verify that the dimensions and electrical phases (e.g., 380V/50Hz vs 480V/60Hz) match your local grid.
How should I negotiate with suppliers on Made-in-China.com for the best value?
Focus on the Total Cost of Ownership (TCO) rather than just the unit price. Negotiate for Extended Warranties (24 months instead of 12) and the inclusion of Wear-and-Tear Spare Parts (like rope guides and brake linings) for the first two years. Ask for Installation Supervision or remote video technical support to be included in the contract price.
What logistics and shipping methods are recommended for large-scale cranes?
For overhead cranes, the main girders often exceed standard container lengths. You should consider 40ft Open Top (OT) containers or Flat Rack (FR) containers. For extremely large gantry cranes, Bulk Cargo (Breakbulk) shipping is necessary. Always ensure the Incoterms are clearly defined; CIF or DAP are often preferred for buyers who want the supplier to handle the complex logistics of heavy lifting equipment.
How can I ensure transaction security for high-value industrial orders?
Use Secured Payment Services provided by Made-in-China.com to ensure funds are only released upon proof of shipment. For large custom builds, use a Staged Payment Plan: 30% deposit, 60% after successful Factory Acceptance Testing (FAT) verified by video or third-party, and 10% after receipt of the Bill of Lading.





























