SourcingAI

Heavy construction equipment

I have found results from300000+products and80000+suppliers aboutHeavy construction equipment

Commonly Used:
US$
—
Customization Available
Sample Available
Manufacturer First
Product Attributes:
Type: Pistons
Type: Mobile Crusher
Type: Crawler Excavator
Type: Road Roller
Type: Top-Slewing Crane
Pressure Pile Driver
Type: Small Loader
Vibration Piling Machine
Type: Straight Arm
Type: Large Grader
Type: Hydraulic Hammer
Concrete Mixing Plant
Asphalt Mixing Plant
Type: Folding
Certification: CE
Condition: New
Track Shoe Width: 600 mm
Motor Type: AC Motor
Motor Power: 280kw
Application: Construction
Materials: Limestone
Outlet Size: 18-48mm
Inlet Size: 600×900mm
Usage: Special Excavator
Bucket: Shovel
Transmission: Hydraulic Transmission
Internal Combustion Drive
Bucket Capacity: 1.0~1.5m³
Size: Medium-Sized
Working Method: Vibration
Engine Type: Diesel Engine
Maximum Lifting Height: 200-250m
Maximum Lifting Weight: 8t
Installation: Assembled
Moving Type: Fixed
Hydraulic Pile Driver
Power Source: Diesel
Noise: Without Noise
Pile Hammer Type: Hydraulic Hammer
Transmission Type: Automatic
Power: Diesel
Load Capacity: 21-30t
Emission Standard: Zero Emission
Drive Wheel: 8×6
Engine Capacity: >8L
Seats: 6-9
Horsepower: 451-500hp
Tire Certification: ECE
Tire Design: Tubeless
Front Lifting Style
Load and Unload Mode: Front Discharge
Walking Mode: Wheeled
Shaft Number: 3
Crane Jib: Three-Arm
Rated Load: 3-6t
Shotcrete Type: Wet
Welded Molding Machine
Structure: Cylinder Type
Productivity: 180m²/h
Color: White
Asphalt Concrete Pavement
Mixing Method: Continuous Drum
Automatic Grade: Automatic
Product Capacity: 40~400t/h
Arm Length: 3.0 meters
Engine Power: 200 hp
Operating Weight: 20 tons
Certification: ISO9001: 2000
Certification: ISO 9001:2000
Certification: ISO 9001:2008
Certification: GS
Certification: RoHS
Certification: ISO9001
Certification: ISO
Certification: TUV
Certification: EPA
Certification: CS
Condition: Used
Track Shoe Width: 300 mm
Motor Power: 90kw
Motor Power: 75kw
Application: Hoisting Machinery
Application: Excavator
Usage: Marine Excavator
Usage: Mining Excavator
Usage: GM Excavator
Bucket: Backhoe
Bucket: Grab Shovel
Transmission: Hydraulic
Hydraulic - Mechanical
Transmission: Power
Drive Type: Electric Drive
Bucket Capacity: 0.1~0.5m³
1.5 cubic meters
Size: Large-Scale
Size: Small-Scale
Maximum Lifting Height: 100-150m
Maximum Lifting Height: 10-15m
Maximum Lifting Height: >40m
Maximum Lifting Weight: 11-13t
Maximum Lifting Weight: 8-10t
Maximum Lifting Weight: >16t
Moving Type: Mobile
Noise: With Noise
Tire Certification: GCC
Tire Certification: ISO
Tire Certification: DOT
Load and Unload Mode: Rotary
Walking Mode: Crawler
Shaft Number: 2
Crane Jib: Four-Arm
Crane Jib: Five-Arm
Rated Load: 6-9t

Sourcing guidance for Heavy Construction Equipment

What are the key technical specifications to evaluate when sourcing heavy construction equipment?

Buyers must prioritize engine performance and emission standards, ensuring engines meet Tier 4 Final or Stage V requirements for regulated markets. Key metrics include operating weight, bucket capacity (for excavators), and lifting capacity (for cranes). Additionally, verify the hydraulic system pressure and flow rates, as these directly impact the machine's cycle time and efficiency. For long-term reliability, ensure the undercarriage or chassis is constructed from high-strength reinforced steel.

Which international compliance standards are mandatory for heavy machinery?

Equipment must adhere to ISO 9249 for net power engine testing and ISO 12100 for machine safety. For the European market, a CE Marking is non-negotiable, while US-bound goods must comply with OSHA and ANSI standards. Furthermore, ensure the machinery features ROPS (Roll-Over Protective Structure) and FOPS (Falling Object Protective Structure) certifications to guarantee operator safety in hazardous environments.

How can I assess the durability and operational lifespan of the equipment?

Request fatigue test reports for critical structural components like booms and arms. Check the brand of core components; high-quality machinery often integrates Kawasaki pumps, Cummins engines, or Rexroth valves. A reputable supplier should provide a service life estimate of at least 10,000 to 15,000 operating hours under standard maintenance protocols. Always ask for ultrasonic weld inspections to ensure structural integrity.

What after-sales support should a B2B buyer expect for heavy machinery?

A professional supplier must offer a comprehensive warranty of at least 12–24 months or 2,000 operating hours. Essential support includes the availability of wear-and-tear spare parts (filters, seals, teeth) in local warehouses and 24/7 technical video support. For large fleets, negotiate for on-site technician training for your local operators and maintenance staff to minimize downtime.

Cross-Border Procurement Risks and Strategic Advice

How can I mitigate transaction risks when purchasing high-value machinery?

Utilize Secured Trading Services on Made-in-China.com to ensure payment is only released upon confirmation of shipment. Always conduct a third-party pre-shipment inspection (PSI) through agencies like SGS or Bureau Veritas to verify that the machine's serial numbers and specifications match the Proforma Invoice. Avoid direct wire transfers to unverified personal accounts.

What are the best shipping strategies for heavy construction equipment?

For oversized machinery, Roll-on/Roll-off (RoRo) shipping is the safest and most cost-effective method. If the equipment can be partially disassembled, Flat Rack or Open Top containers may be used. Ensure the supplier provides a detailed lashing and bracing plan to prevent shifting during maritime transit, and always secure All-Risk Marine Insurance covering 110% of the CIF value.

How should I negotiate with suppliers for bulk fleet orders?

Focus on the Total Cost of Ownership (TCO) rather than just the initial purchase price. Negotiate for a spare parts package (worth 3-5% of the order value) to be included for free. For orders exceeding 5 units, request progressive volume discounts of 10-15% and ask for customized branding/livery at no additional cost to align with your corporate identity.

What documentation is required for international customs clearance of heavy machinery?

Ensure the supplier provides a Certificate of Origin (CO) to potentially benefit from Free Trade Agreements (FTAs). You will also need a detailed Packing List, Commercial Invoice, and Bill of Lading. For used or refurbished machinery, a Decontamination Certificate and an EPA/Emission Compliance Statement are often required to pass environmental inspections at the destination port.

Related queries